|
|
 |
Road design, traffic management
|
|
|
New-alignment facilities
- Road 62 – Perkáta Bypass (Construction plan)
- D1 section of Gödöllő Bypass (Approval and Construction plans)
- 3 new roundabouts and rebuilding of an existing roundabout on Road 5. and 54. near the Daimler Factory (Approval and Construction plans)
- Nagykőrös by-pass of trunkroad no 441 (plans for approval)
- M7 Motorway Pusztazámor – Tárnok Intersection (Approval and Construction plans)
- Érd, Road-Railway Intersection at Bagoly street (Approval and Construction plans)
- Érd, Road-Railway Intersection at Duna street (Approval and Construction plans)
- Reconstruction of MÁV Budapest – Pusztaszabolcs line:
- Pusztaszabolcs by-pass section of road no 6207 (plans for approval)
- Multilevel passage of road no 6205, Beloiannisz (plans for approval)
- Road correction of trunkroad no 6, Százhalombatta (plans for approval)
- Road design included in the development of Dabas center (Approval and Construction plans)
- Alsónémedi településközpont építészeti és környezetrendezési rekonstrukciójának, fejlesztésének tervezése (döntéselőkészítő tanulmány és engedélyezési terv)
- Design of urban streets in Budakeszi (final design)
- Urban streets in Kistarcsa (plans for approval)
- District XIV., street design: Bíztató street, Buják street, Kocsmáros street, Ostorhegy street, Vágás street (Construction plan)
- Public roads, bycicle tracks, predestrian paths, parking places and rainwater drainages in Tatabánya (plans for approval)
- Bicycle road in Jókai street and Berényi street in Békéscsaba (Approval and Construction plans)
- Bycicle track by Régi Fóti road (plans for approval)
- Bycicle track by Nagykőrösi road – Vasút street (plans for approval)
Road rehabilitation/reconstruction
- Bridge and road surface refurbishment of M19 motorway and the crossing roads (Construction plans)
- Road surface refurbishment on the right side between 13+100-18+100, 100+000-103+700, 113+100-113+300, bal pálya 78+035-78+180
- Road surface refurbishment of M1 motorway, right side 94+350-97+925 km
- Road surface refurbishments of Budapest in 2006:
- Pavement strenghtening of Régi Fóti road and bicycle track design (final design)
- Pavement reconstruction of Topánka street and bicycle track design (final design)
- Road surface refurbishments of Budapest in 2007:
- Pavement strenghtening of Nagykőrösi road and bicycle track design (final design)
- Pavement reconstruction of Drégelyvár street (final design)
- Pavement reconstruction of Mogyoródi road (final design)
- Pavement reconstruction of Költő street and Diana street (final design)
- Road surface refurbishments of Budapest in 2008::
- District XVII., Ferihegyi road between Pesti street – Szabadság street
- District IV. Baross street between Fóti street – Erdősor street
- District IV. Szent Imre street (Leiningen Károly street. – Görgey Artúr street.)
- Pavement strenghtening of trunkroad no 6 section from km 18+012 to km (final design)
- Pavement strenghtening of trunkroad no between km 5+000 and km 9+000 (final design)
- Pavement strenghtening of road no 4602 between km 8+971 and km 12+935 (final design)
- Pavement rehabilitation of road no 46111 between km 0+000 and km 1+000 (final design)
- Pavement strenghtening of connecting road no 52101 between km 0+000 and 5+200 (final design)
- Pavement strenghtening of trunkroad no 4 section from km 19+700 to km 20+840 (final design)
- Section improvements of road no 1102 from km 6+300 to km 8+400 (final design)
- Section improvements of road no 1106 from km 14+900 to km 16+900 (final design)
- Section improvements of road no 11107 between km 0+400 and km 4+408
- Pavement strenghtening of road no 2102 between km 13+100 and km 17+000 (final design)
- Section improvements of road no 2105 from km 8+700 to km 9+500 (final design)
- Section improvements of road no 21101 from km 0+000 to km 2+900 (final design)
- Pavement strenghtening of road no 21113 between km 2+600 and 7+000 (final design)
- Pavement strenghtening of road no 21321 between km 0+000 and 0+800 (final design)
- Pavement strenghtening of trunkroad no 441 from km 14+525 and km 18+500 (final design)
- Section improvements of road no 4601 between km 76+600 and 78+575 (final design)
- Section improvements of road no 51309 from km 0+000 to km 4+600 (final design)
- Pavement strenghtening of road no 5203 from km 11+650 to km 17+000 (final design)
- Pavement reconstruction of Budapest – Tiszakécske connecting road no 4601 between km 76,6 and km 78,6 (plan review and final design)
- Pavement reconstruction of Vecsés and Alsónémedi connecting road no 4602 between km 9,0 and km 12,9 (plan review and final design)
- Pavement reconstruction of road no 52101 from km 0,0 to km 5,2 (plan review and final design)
- Pavement reconstruction of road no 4606 between km 26+470 and km 30+441.68 (final design)
- Pavement reconstruction of road no 46105 from km 0+000 to km 0+471,55 and pavement streghtening of road no 46106 between km 1+600 and km 3+501,90 (final design)
- Pavement reconstruction of road no 5202 from km 14+035 to km 15+738,10 (final design)
- Road surface refurbishment of Road 4604. between 0+000 – 6+100 (Construction plans)
- Road surface strengthening (11.5 t) of Main Road 31. between 106+103 – 129+159 (Approval and Construction plans)
- Road surface strengthening (11.5 t) of Main Road 33. between 0+000 – 33+078 (Approval and Construction plans)
- Road surface refurbishment of Kertész street and Máriavölgyi street in Budaörs; Design of a stairs at Ostor street – Kőszírt street
- Road surface strengthening (11.5 t) of Main Road 41. between Vásárosnamény - Beregsurány
Other road design works
- Mogyoród, road connection of the asphalt factory (Approval plans)
- Road connection and parking area of an Alsónémedi CBA supermarket
- Traffic directing, traffic light installation of Junction of Iskola street, Páty (Combined design)
- Road design works of Shell petrol stations (Combined design)
- Traffic management plans of provisional passage of Border crossing point
- District XIV. – Hotel Stadion Parking Area (Construction plan)
- 15 Bus stops within the network modifications of BKV Zrt. (Construction plan)
Forgalomtechnikai munkák
- Több, mint 100 helyszínen ideiglenes és végleges forgalomtechnikai tervek készítése
|
 |