Constructed steel bridges
|
|
|
|
|
 |
|
 |
Year of design: |
|
2017 |
 |
Client(s): |
|
NIF Zrt. |
 |
Year of construction: |
|
2018 - 2018 |
 |
Contractor(s): |
|
A-HÍD Építő Zrt. |
 |
Structure: |
|
vasbeton pályalemezzel együttdolgozó részlegesen befogott acél gerendahíd |
 |
Span(s): |
|
két támaszú hidak támaszközei 60,70 m és 59,30 m |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2014 |
 |
Client(s): |
|
Főmterv Zrt. |
 |
Year of construction: |
|
2014 - 2015 |
 |
Contractor(s): |
|
CSABA-2013 Konzorcium |
 |
Structure: |
|
one pylon cable-stayed girder bridge with orthotropic deck |
 |
Width: |
|
Max. 30,00 m
|
 |
Structural height: |
|
1.40 m (main girder) |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2013 - 2014 |
 |
Year of construction: |
|
2014 - 2015 |
 |
Contractor(s): |
|
SWIETELSKY - HE-DO Konzorcium |
 |
Structure: |
|
twin girdered clamped composite bridge |
 |
Span(s): |
|
49,55 m |
 |
Width: |
|
47,55 m |
 |
Width of the superstructure: |
|
7,13 m |
 |
Section |
|
16+565,00 |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2013 - 2014 |
 |
Client(s): |
|
Hatvan Város Önkormányzata |
 |
Year of construction: |
|
2014 |
 |
Contractor(s): |
|
K-H Konzorcium (KÖZGÉP Zrt. - A-HÍD Építő Zrt.) |
 |
Structure: |
|
Four-span continuous steel bridge. Through arch bridge with orthotropic deck box girder at the span above the railway („A-B”), twin girdered beam bridge at the other openings (from „B" until „E” support). |
 |
Span(s): |
|
56.0 - 32.0 - 24.0 - 20.0 m |
 |
Structural height: |
|
1.60 m |
 |
Width of the superstructure: |
|
20,50m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2012 - 2014 |
 |
Year of construction: |
|
2014 |
 |
Contractor(s): |
|
Hídtechnika Kft. |
 |
Structure: |
|
two cable-stayed bridge with rigid reinforcement stiffners |
 |
Datas |
|
Bridge at South
Span between centres: 15.25 m + 36.00 m
Span: 14.65 m + 35.20 m
Width of the superstructure: 3.60 m
Width of the transferred road: 3.25 m
Bridge at North
Span between centres: 33.90 m + 25.67 m
Span: 33.10 m + 25.12 m
Width of the superstructure: 3.60 m
Width of the transferred road: 3.25 m
|
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2014 |
 |
Year of construction: |
|
2014 |
 |
Contractor(s): |
|
KÖZGÉP - STRABAG Konzorcium |
 |
Structure: |
|
simply supported deck arch bridge |
 |
Span(s): |
|
62,00 m |
 |
Width: |
|
7,14m (0,985m+0,835m+3,5m+0,835m+0,985m) |
 |
Structural height: |
|
86cm-4,50m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2013 - 2014 |
 |
Year of construction: |
|
2013 - 2014 |
 |
Contractor(s): |
|
Bilfinger MCE GmbH |
 |
Structure: |
|
cable-stayed bridge, steel pylon and composite cross section stiffner |
 |
Span(s): |
|
42,64 – 146,32 – 33,24 m |
 |
Country: |
|
Germany |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2010 |
 |
Client(s): |
|
Savaria Városfejlesztési Kft. |
 |
Year of construction: |
|
2014 - 2015 |
 |
Structure: |
|
steel bridge with one span, clamped at the supports and hinged at the middle |
 |
Span(s): |
|
30.50 m |
 |
Width: |
|
0.15 m + 3.10 m + 0.15 m |
 |
Structural height: |
|
0.10 - 1.12 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2011 - 2013 |
 |
Client(s): |
|
GYSEV Zrt. |
 |
Year of construction: |
|
2013 - 2014 |
 |
Contractor(s): |
|
KÖZGÉP Építő- és Fémszerkezetgyártó Zrt. |
 |
Structure: |
|
continuous two-span girder, a continuous “langer” static system, where two spans with different length werebuilt with arches,with a concrete slab inside the “I section “ steel main
girders |
 |
Span(s): |
|
27.00 – 21.00 – 39.00 m |
 |
Structural height: |
|
0.61 m |
 |
Width of the superstructure: |
|
3.26 m |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2012 - 2013 |
 |
Year of construction: |
|
2012 - 2013 |
 |
Contractor(s): |
|
Bilfinger MCE GmbH |
 |
Structure: |
|
five span, twin box girder composite bridge with concrete slab |
 |
Span(s): |
|
52,43 – 3 x 62,75 – 52,43 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2009 |
 |
Client(s): |
|
COWI-UTIBER Konzorcium |
 |
Structure: |
|
simply supported composite slab bridge |
 |
Span(s): |
|
13.80 m |
 |
Width: |
|
12,60 m (1.85 m+8.90 m+1.85m) |
 |
Structural height: |
|
0.73 - 0.85 m |
 |
Quantity of steel |
|
53 t |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2011 |
 |
Year of construction: |
|
2011 - 2012 |
 |
Contractor(s): |
|
PORR Építő Kft. |
 |
Structure: |
|
four-span, four girder steel beam bridge with concrete deck |
 |
Span(s): |
|
16,22 – 25,50 – 16,50 – 16,22 m |
 |
Structural height: |
|
1,215–2,090 m |
 |
Width of the superstructure: |
|
12,62 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2011 |
 |
Year of construction: |
|
2011 - 2012 |
 |
Contractor(s): |
|
KS Szombathely Konzorcium |
 |
Structure: |
|
steel structure with three main girder with reinforced concrete deck, wind brace and transverse truss on the bottom side |
 |
Span(s): |
|
24,80 + 28,00 + 33,00 + 27,00 + 23,00 + 17,80 m |
 |
Width of the superstructure |
|
Until 0+307,97 km 10,13m, from 0+307,97 km until 0+340,30 km widens, then from 0+340,30 km the width is 12,63m |
 |
Structural height in axis |
|
From 0+280,33 km the height is 1,65 m, between 0+280,33 and 0+330,03 km 1,65 – 1,68 m, then from 0+330,03 km 1,68 m |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2009 |
 |
Client(s): |
|
SK 2008 Consortium (Strabag Zrt., Közgép Zrt.) |
 |
Year of construction: |
|
2009 - 2010 |
 |
Structure: |
|
river bridge: tied steel arch bridge with ortotropic deck
side spans: reinforced concrete girder bridges |
 |
Span(s): |
|
18,62+4x18,67+50,00+17,83+17,34+17,31 m |
 |
Width: |
|
13,80 m (2,65 m+8,50 m+2,65 m) |
 |
Structural height: |
|
0,94 m (steel bridge)
1,54 m (reinforced concrete bridges) |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2006 |
 |
Client(s): |
|
Magyar Közút Kht. |
 |
Year of construction: |
|
2009 - 2010 |
 |
Structure: |
|
Tied steel arch-bridge with ortotropic deck and "network" hanging system |
 |
Span(s): |
|
45,00 m |
 |
Width: |
|
15,23 m (3,615 m+8,00 m+3,615 m) |
 |
Structural height: |
|
1,025 m |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2006 |
 |
Client(s): |
|
MÁVTI Kft. |
 |
Year of construction: |
|
2009 - 2010 |
 |
Structure: |
|
Underdecked steel girder bridge with ortotrope deck and ballasted track |
 |
Span(s): |
|
28,70 m |
 |
Width: |
|
7,40 m (1,00 m+5,40 m+1,00 m) |
 |
Structural height: |
|
1,62 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2009 |
 |
Client(s): |
|
GYSEV Zrt. |
 |
Contractor(s): |
|
Savaria 2009 Consortium (Superstructure - KÖZGÉP Zrt.; Substructures - Magyar Aszfalt Kft.) |
 |
Structure: |
|
steel girder bridge with orthotrop steel deck and direct rail mounting |
 |
Span(s): |
|
26,00 m |
 |
Width: |
|
1,54+5,10+1,54 m |
 |
Structural height: |
|
616 mm |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2008 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2009 |
 |
Contractor(s): |
|
Mecsek Autópálya Koncessziós Zrt./Közgép Zrt. |
 |
Structure: |
|
steel frame - 3 spans |
 |
Span(s): |
|
8,91 m+40,66 m+8,93 m |
 |
Width: |
|
2,64 m |
 |
Structural height: |
|
0,23-0,87 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2007 |
 |
Client(s): |
|
COLAS Dunántúl Zrt. |
 |
Year of construction: |
|
2008 |
 |
Contractor(s): |
|
COLAS Dunántúl Zrt., Mértan Kft., Pilontechnika 52 Kft. |
 |
Structure: |
|
steel girder bridge with orthotropic deck |
 |
Span(s): |
|
15,04 m+27,50 m+18,54 m |
 |
Width: |
|
4,81 m (with cleaning sidewalk). 3,47 m (in front of the lifts); 3,00 m (at the stairs) |
 |
Structural height: |
|
0,25 m |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2007 |
 |
Client(s): |
|
Hídtechnika Kft., Közgép Zrt. |
 |
Year of construction: |
|
2008 |
 |
Contractor(s): |
|
Hídtechnika Kft., Közgép Zrt. |
 |
Structure: |
|
replacement of the existing truss superstructure with a new steel girder bridge with orthotropic deck |
 |
Span(s): |
|
18,54 m |
 |
Width: |
|
10,63 m (2,065 m+6,50 m+2,065 m) |
 |
Structural height: |
|
1,00 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2007 |
 |
Client(s): |
|
COLAS Dunántúl Zrt. |
 |
Year of construction: |
|
2007 |
 |
Contractor(s): |
|
COLAS Dunántúl Zrt., MÁV Hídépítő Kft., Mértan Kft. |
 |
Structure: |
|
cable stayed steel girder bridge with orthotropic deck |
 |
Span(s): |
|
18,00 m+43,00 m |
 |
Width: |
|
6,80 m (1,00 m+4,80 m+1,00 m) |
 |
Structural height: |
|
0,36 m |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2006 |
 |
Client(s): |
|
Budapest Főváros Önkormányzata |
 |
Year of construction: |
|
2006 - 2007 |
 |
Contractor(s): |
|
Hídépítő Zrt., Betonplasztika Kft., MÁV Hídépítő Kft. |
 |
Structure: |
|
steel tied arch with composite deck |
 |
Span(s): |
|
38,00 m |
 |
Width: |
|
13,00 m (2,875 m + 8,00 m + 2,125 m) |
 |
Structural height: |
|
0,685 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt., MAHÍD2000 Zrt., Gyárépszer Kft., Molnár Zrt., Pilontechnika 52 Kft. |
 |
Structure: |
|
steel-concrete composite girders |
 |
Span(s): |
|
30,60 m +40,00 m+30,60 m (101,20 m) |
 |
Width: |
|
13,88 m (1,315 m+11,00 m+1,565 m) |
 |
Structural height: |
|
2,47 m |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt., MAHÍD2000 Zrt., MCE Nyíregyháza Kft. |
 |
Structure: |
|
steel-concrete composite girders |
 |
Span(s): |
|
left path: 30,58 m+50,61 m+30,57 m (111,76 m)
right path: 28,88 m+47,89 m+28,87 m (106,64 m) |
 |
Width: |
|
left path: 17,88 m (1,565 m+15,75 m+0,565 m)
right path: 15,80 m (0,565 m+13,67 m+1,565 m) |
 |
Structural height: |
|
left path: 2,59 m right path: 2,47 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2004 |
 |
Client(s): |
|
Betonútépítő Zrt. |
 |
Year of construction: |
|
2004 |
 |
Contractor(s): |
|
Betonútépítő Zrt. |
 |
Structure: |
|
steel girder road provision with orthotropic deck made from a former railway provision |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2004 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2004 |
 |
Contractor(s): |
|
Vegyépszer Zrt., MAHÍD2000 Zrt., GANZ Acélszerkezet Zrt. |
 |
Structure: |
|
steel-concrete composite girders |
 |
Span(s): |
|
38,00 m + 45,00 m + 45,00 m + 35,00 m (179,70 m) |
 |
Width: |
|
2*12,83 m (0,565 m + 11,00 m + 0,565 m) |
 |
Structural height: |
|
2,44 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2004 |
 |
Client(s): |
|
Konstruma Kft. |
 |
Year of construction: |
|
2004 - 2005 |
 |
Contractor(s): |
|
MÁV Hídépítő Kft. |
 |
Structure: |
|
steel tied arch bridge with orthotropic deck |
 |
Span(s): |
|
36,00 m |
|
|
|
|
|
|
 |
|