Concrete bridge reconstruction

 

The list is not complete, uploading soon.

  • Structural design of the reinforcement of Pécel creek bridge at section 13+357 of road 3102
  • Structural design of the reinforcement of Töki creek bridge at section 12+116 of road 1104
  • Structural design of the reinforcement of road bridge at section 24+820 of road 6601 between Oroszló and Szentlőrinc
  • Inspection of Séd-creek bridge at section between 2+700 and 3+150 of road No.56, structural design of reinforcement by composite strips
  • Design of widening and reinforcment of Csákánydoroszló Rába overbank bridge at section 30+674 of road No.7451

   

6402.j. út 12+027 km szelvényében lévő Mezőkomáromi Sió-híd

Year of design:   2008 - 2010
Client(s):   NIF Zrt.
Structure:   Gerber-rendszerű, két főtartós, monolit vasbeton híd
Span(s):   8,93+ 33,50 m + 8,93 m
Width:   1,40m + 7,00m + 1,40m
Structural height:   1,43 - 3,40 m
Details >>