M6 highway "M0-Érd Top hill" section
|
|
|
.
|
|
 |
M6 highway, "M0-Érd top hill" section, M0/109/b sz. overpass over the Barackos street
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
reinforced concrete slab bridge |
 |
Span(s): |
|
12,63 m+14,11 m+12,67 m (39,41 m) |
 |
Width: |
|
18,13 m (1,315 m+16,25 m+0,565 m) |
 |
Structural height: |
|
0,85 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M0/109/j sz. overpass over the Barackos street
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
reinforced concrete slab bridge |
 |
Span(s): |
|
12,65 m+14,10 m+12,65 m (39,40 m) |
 |
Width: |
|
23,30-26,80 m (0,565 m+16,75 m+[1,62 m-5,25 m]+ [2,75 m]+[1,565 m]) |
 |
Structural height: |
|
0,85 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M0/109/gy sz. overpass over the Barackos street
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
reinforced concrete slab bridge |
 |
Span(s): |
|
12,68 m+14,12 m+12,64 m (39,44 m) |
 |
Width: |
|
11,88 m (1,565 m+9,00 m+1,315 m) |
 |
Structural height: |
|
0,75 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M0/123 sz. overpass over the Diós-árok
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
reinforced concrete frame bridge |
 |
Span(s): |
|
5,01 m |
 |
Width: |
|
46,96 m-47,21 m (1,315 m+(22,31 m-22,56 m)+
0,99 m+0,02 m+0,99 m+20,02 m+1,315 m) |
 |
Structural height: |
|
0,65 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M0/124 sz. overpass over pedestrian road
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
reinforced concrete frame bridge |
 |
Span(s): |
|
3,37 m |
 |
Width: |
|
46,33 m-46,461 m (1,315 m+(21,685 m-21,815 m) +0,99 m+0,02 m+0,99 m+20,015 m+1,315 m) |
 |
Structural height: |
|
0,65 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M6/141 sz. overpass over the M0 highway
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
left pass: 29,22 m+29,51 m+31,55 m+25,58 m+33,95 m+28,22 m+28,67 m+21,08 m (227,78 m)
right pass: 22,08 m+34,37 m+33,84 m+25,58 m+36,80 m+25,37 m+28,67 m+21,08 m (227,79 m) |
 |
Width: |
|
left pass: 11,68 m (1,615 m+9,50 m+0,565 m)
right pass: 14,18 m (0,565 m+12,00 m+1,615m) |
 |
Structural height: |
|
1,58 m |
|
|
 |
|
|
|
|
|
 |
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt., MAHÍD2000 Zrt., Gyárépszer Kft., Molnár Zrt., Pilontechnika 52 Kft. |
 |
Structure: |
|
steel-concrete composite girders |
 |
Span(s): |
|
30,60 m +40,00 m+30,60 m (101,20 m) |
 |
Width: |
|
13,88 m (1,315 m+11,00 m+1,565 m) |
 |
Structural height: |
|
2,47 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M6/143/k sz. overpass over the Angeli street
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
13,11 m+19,39 m+13,22 m (45,72 m) |
 |
Width: |
|
9,88 m (1,315 m+7,00 m+1,565 m) |
 |
Structural height: |
|
1,28 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M6/147/k sz. overpass over the MÁV Budapest-Pusztaszbolcs railway line
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
23,17 m+33,40 m+23,20 m (79,77 m) |
 |
Width: |
|
10,88 m (0,565 m+9,00 m+1,315 m) |
 |
Structural height: |
|
1,57 m |
|
|
|
|
|
|
|
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt., MAHÍD2000 Zrt., MCE Nyíregyháza Kft. |
 |
Structure: |
|
steel-concrete composite girders |
 |
Span(s): |
|
left path: 30,58 m+50,61 m+30,57 m (111,76 m)
right path: 28,88 m+47,89 m+28,87 m (106,64 m) |
 |
Width: |
|
left path: 17,88 m (1,565 m+15,75 m+0,565 m)
right path: 15,80 m (0,565 m+13,67 m+1,565 m) |
 |
Structural height: |
|
left path: 2,59 m right path: 2,47 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M6/154 sz. overpass over the Bányalég street pedestrian road
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
reinforced concrete frame bridge |
 |
Span(s): |
|
4,00 m |
 |
Width: |
|
left pass: 17,86 m (1,315 m+15,75 m+0,79 m)
right pass: 14,36 m (0,79 m+12,00 m+1,565 m) |
 |
Structural height: |
|
0,58 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M6/156 sz. underpass under the Bányalég street
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
concrete box girder |
 |
Span(s): |
|
28,00 m+35,00 m+33,92 m (96,92 m) |
 |
Width: |
|
12,13 m (2,565 m+9,00 m+0,565 m) |
 |
Structural height: |
|
1,73 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M6/167 sz. overpass over the MÁV Budapest-Székesfehérvár railway line
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
left pass: 18,39 m+22,41 m+34,39 m+32,38 m+22,38 m+18,38 m (148,33 m)
right pass: 25,55 m+32,22 m+34,09 m+34,17 m+26,89 m (152,92 m) |
 |
Width: |
|
left pass: 15,88 m (1,565 m+13,75 m+0,565 m)
right pass: 14,825 m (0,565 m+12,695 m+1,565 m) |
 |
Structural height: |
|
1,60 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M6/168/k sz. overpass over the MÁV Budapest-Székesfehérvár railway line
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
18,25 m+21,43 m+25,40 m+16,37 m+14,16 m (95,61 m) |
 |
Width: |
|
12,88 m (0,565 m+11,00 m+1,315 m) |
 |
Structural height: |
|
1,28 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, "M0-Érd top hill" section, M6/170 sz. overpass over the 6. main road
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
12,10 m+19,20 m+14,10 m (45,40 m) |
 |
Width: |
|
left pass: 18,515 m (1,565 m+16,385 m+0,565 m)
right pass: 15,88 m (0,565 m+13,75 m+1,565 m) |
 |
Structural height: |
|
1,28 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M6/183/k sz. Érd-Ófalu branch overpass over the Bara-stream
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
7,00 m |
 |
Width: |
|
10,13 m (0,565 m+9,00 m+0,565 m) |
 |
Structural height: |
|
0,83 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M6/186 sz. overpass over the Sulák-stream
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
13,70 m |
 |
Width: |
|
left pass: 18,19m-17,94 m (1,315 m+(16,31 m-16,06 m)+0,565 m)
right pass: 17,13 m (0,565 m+15,25 m+1,315 m) |
 |
Structural height: |
|
0,83 cm |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M6/192 sz. underpass under the Érd-Ófalu junction
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
reinforced concrete slab bridge |
 |
Span(s): |
|
13,26 m+18,58 m+16,29 m+11,34 m (59,47 m) |
 |
Width: |
|
12,13 m (0,565 m+11,00 m+0,565 m) |
 |
Structural height: |
|
1,05 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M6/195/k sz. overpass over the Bara-stream
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
8,59 m |
 |
Width: |
|
left pass: 14,88 m (0,565 m+13,75 m+0,565 m)
right pass: 16,88 m (0,565 m+15,75 m+0,565 m) |
 |
Structural height: |
|
0,83 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M6/199 sz. overpass over the pedestrian road
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
reinforced concrete frame bridge |
 |
Span(s): |
|
3,40 m |
 |
Width: |
|
highway on embankment |
 |
Structural height: |
|
48 cm+embankment height |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M6/200 sz. overpass over the Felső street
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
17,06 m+19,16 m+16,05 m (52,27 m) |
 |
Width: |
|
left pass: 14,13 m (1,565 m+12,00 m+0,565 m)
right pass: 17,63 m (0,565 m+15,75 m+1,315 m) |
 |
Structural height: |
|
1,28 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, M6/208 sz. underpass under the Júlia street
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
24,10 m+24,20 m+19,10 m (67,40 m) |
 |
Width: |
|
12,13 m (0,565 m+11,00 m+0,565 m) |
 |
Structural height: |
|
1,28 m |
|
|
 |
|
|
|
|
|
 |
M6 highway, "M0-Érd top hill" section, M6/214 sz. overpass over the 6. main road
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Contractor(s): |
|
Vegyépszer Zrt. |
 |
Structure: |
|
concrete slab bridge with hollow section |
 |
Span(s): |
|
14,56 m+18,01 m+14,89 m (47,46 m) |
 |
Width: |
|
left pass: 16,515 m (1,565 m+14,385 m+0,565 m)
right pass: 17,015 m (0,565 m+14,885 m+1,565 m) |
 |
Structural height: |
|
1,05 m |
|
|
|
|
|
|
|
M6 highway, "M0-Érd top hill" section, 6/1 sz. planned 6.-7. sz. main road correction overpass above the Bara-stream
|
 |
Year of design: |
|
2005 |
 |
Client(s): |
|
CÉH Zrt. |
 |
Year of construction: |
|
2007 - 2008 |
 |
Structure: |
|
precast, prestressed girders concrete bridge |
 |
Span(s): |
|
7,00 m |
 |
Width: |
|
12,13 m (0,565 m+11,00 m+0,565 m) |
 |
Structural height: |
|
0,83 m |
|
|
 |
|
|
|
|
 |
|