M6 highway "M0-Érd Top hill" section

 
.

   
M6 highway, "M0-Érd top hill" section, M0/109/b sz. overpass over the Barackos street

M6 highway, "M0-Érd top hill" section, M0/109/b sz. overpass over the Barackos street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   reinforced concrete slab bridge
Span(s):   12,63 m+14,11 m+12,67 m (39,41 m)
Width:   18,13 m (1,315 m+16,25 m+0,565 m)
Structural height:   0,85 m
   
   

M6 highway, "M0-Érd top hill" section, M0/109/j sz. overpass over the Barackos street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   reinforced concrete slab bridge
Span(s):   12,65 m+14,10 m+12,65 m (39,40 m)
Width:   23,30-26,80 m (0,565 m+16,75 m+[1,62 m-5,25 m]+ [2,75 m]+[1,565 m])
Structural height:   0,85 m
M6 highway, "M0-Érd top hill" section, M0/109/j sz. overpass over the Barackos street
   
   
M6 highway, "M0-Érd top hill" section, M0/109/gy sz. overpass over the Barackos street

M6 highway, "M0-Érd top hill" section, M0/109/gy sz. overpass over the Barackos street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   reinforced concrete slab bridge
Span(s):   12,68 m+14,12 m+12,64 m (39,44 m)
Width:   11,88 m (1,565 m+9,00 m+1,315 m)
Structural height:   0,75 m
   
   

M6 highway, "M0-Érd top hill" section, M0/123 sz. overpass over the Diós-árok

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   reinforced concrete frame bridge
Span(s):   5,01 m
Width:   46,96 m-47,21 m (1,315 m+(22,31 m-22,56 m)+ 0,99 m+0,02 m+0,99 m+20,02 m+1,315 m)
Structural height:   0,65 m
M6 highway, "M0-Érd top hill" section, M0/123 sz. overpass over the Diós-árok
   
   
M6 highway, "M0-Érd top hill" section, M0/124 sz. overpass over pedestrian road

M6 highway, "M0-Érd top hill" section, M0/124 sz. overpass over pedestrian road

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   reinforced concrete frame bridge
Span(s):   3,37 m
Width:   46,33 m-46,461 m (1,315 m+(21,685 m-21,815 m) +0,99 m+0,02 m+0,99 m+20,015 m+1,315 m)
Structural height:   0,65 m
   
   

M6 highway, "M0-Érd top hill" section, M6/141 sz. overpass over the M0 highway

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   left pass: 29,22 m+29,51 m+31,55 m+25,58 m+33,95 m+28,22 m+28,67 m+21,08 m (227,78 m)
right pass: 22,08 m+34,37 m+33,84 m+25,58 m+36,80 m+25,37 m+28,67 m+21,08 m (227,79 m)
Width:   left pass: 11,68 m (1,615 m+9,50 m+0,565 m)
right pass: 14,18 m (0,565 m+12,00 m+1,615m)
Structural height:   1,58 m
M6 highway, "M0-Érd top hill" section, M6/141 sz. overpass over the M0 highway
   
   
M6-M0 highway junction, M0/142/K. sz. overpass over the Angeli street

M6-M0 highway junction, M0/142/K. sz. overpass over the Angeli street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt., MAHÍD2000 Zrt., Gyárépszer Kft., Molnár Zrt., Pilontechnika 52 Kft.
Structure:   steel-concrete composite girders
Span(s):   30,60 m +40,00 m+30,60 m (101,20 m)
Width:   13,88 m (1,315 m+11,00 m+1,565 m)
Structural height:   2,47 m
Details >>    
   
   

M6 highway, "M0-Érd top hill" section, M6/143/k sz. overpass over the Angeli street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   13,11 m+19,39 m+13,22 m (45,72 m)
Width:   9,88 m (1,315 m+7,00 m+1,565 m)
Structural height:   1,28 m
M6 highway, "M0-Érd top hill" section, M6/143/k sz. overpass over the Angeli street
   
   
M6 highway, "M0-Érd top hill" section, M6/147/k sz. overpass over the MÁV Budapest-Pusztaszbolcs railway line

M6 highway, "M0-Érd top hill" section, M6/147/k sz. overpass over the MÁV Budapest-Pusztaszbolcs railway line

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   23,17 m+33,40 m+23,20 m (79,77 m)
Width:   10,88 m (0,565 m+9,00 m+1,315 m)
Structural height:   1,57 m
   
   

M6 highway, "M0-Érd top hill" section, M6/147. sz. overpass

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt., MAHÍD2000 Zrt., MCE Nyíregyháza Kft.
Structure:   steel-concrete composite girders
Span(s):   left path: 30,58 m+50,61 m+30,57 m (111,76 m)
right path: 28,88 m+47,89 m+28,87 m (106,64 m)
Width:   left path: 17,88 m (1,565 m+15,75 m+0,565 m)
right path: 15,80 m (0,565 m+13,67 m+1,565 m)
Structural height:   left path: 2,59 m right path: 2,47 m
Details >>    
M6 highway, "M0-Érd top hill" section, M6/147. sz. overpass over the MÁV Bp.-Pusztaszabolcs railway line
   
   
M6 highway, "M0-Érd top hill" section, M6/154 sz. overpass over the Bányalég street pedestrian road

M6 highway, "M0-Érd top hill" section, M6/154 sz. overpass over the Bányalég street pedestrian road

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   reinforced concrete frame bridge
Span(s):   4,00 m
Width:   left pass: 17,86 m (1,315 m+15,75 m+0,79 m)
right pass: 14,36 m (0,79 m+12,00 m+1,565 m)
Structural height:   0,58 m
   
   

M6 highway, "M0-Érd top hill" section, M6/156 sz. underpass under the Bányalég street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   concrete box girder
Span(s):   28,00 m+35,00 m+33,92 m (96,92 m)
Width:   12,13 m (2,565 m+9,00 m+0,565 m)
Structural height:   1,73 m
M6 highway, "M0-Érd top hill" section, M6/156 sz. underpass under the Bányalég street
   
   
M6 highway, "M0-Érd top hill" section, M6/167 sz. overpass over the MÁV Budapest-Székesfehérvár railway line

M6 highway, "M0-Érd top hill" section, M6/167 sz. overpass over the MÁV Budapest-Székesfehérvár railway line

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   left pass: 18,39 m+22,41 m+34,39 m+32,38 m+22,38 m+18,38 m (148,33 m)
right pass: 25,55 m+32,22 m+34,09 m+34,17 m+26,89 m (152,92 m)
Width:   left pass: 15,88 m (1,565 m+13,75 m+0,565 m)
right pass: 14,825 m (0,565 m+12,695 m+1,565 m)
Structural height:   1,60 m
   
   

M6 highway, "M0-Érd top hill" section, M6/168/k sz. overpass over the MÁV Budapest-Székesfehérvár railway line

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   18,25 m+21,43 m+25,40 m+16,37 m+14,16 m (95,61 m)
Width:   12,88 m (0,565 m+11,00 m+1,315 m)
Structural height:   1,28 m
M6 highway, "M0-Érd top hill" section, M6/168/k sz. overpass over the MÁV Budapest-Székesfehérvár railway line
   
   
M6 highway, "M0-Érd top hill" section, "M0-Érd top hill" section, M6/170 sz. overpass over the 6. main road

M6 highway, "M0-Érd top hill" section, "M0-Érd top hill" section, M6/170 sz. overpass over the 6. main road

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   12,10 m+19,20 m+14,10 m (45,40 m)
Width:   left pass: 18,515 m (1,565 m+16,385 m+0,565 m)
right pass: 15,88 m (0,565 m+13,75 m+1,565 m)
Structural height:   1,28 m
   
   

M6 highway, "M0-Érd top hill" section, M6/183/k sz. Érd-Ófalu branch overpass over the Bara-stream

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   7,00 m
Width:   10,13 m (0,565 m+9,00 m+0,565 m)
Structural height:   0,83 m
M6 highway, "M0-Érd top hill" section, M6/183/k sz. Érd-Ófalu branch overpass over the Bara-stream
   
   
M6 highway, "M0-Érd top hill" section, M6/186 sz. overpass over the Sulák-stream

M6 highway, "M0-Érd top hill" section, M6/186 sz. overpass over the Sulák-stream

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   13,70 m
Width:   left pass: 18,19m-17,94 m (1,315 m+(16,31 m-16,06 m)+0,565 m)
right pass: 17,13 m (0,565 m+15,25 m+1,315 m)
Structural height:   0,83 cm
   
   

M6 highway, "M0-Érd top hill" section, M6/192 sz. underpass under the Érd-Ófalu junction

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   reinforced concrete slab bridge
Span(s):   13,26 m+18,58 m+16,29 m+11,34 m (59,47 m)
Width:   12,13 m (0,565 m+11,00 m+0,565 m)
Structural height:   1,05 m
M6 highway, "M0-Érd top hill" section, M6/192 sz. underpass under the Érd-Ófalu junction
   
   
M6 highway, "M0-Érd top hill" section, M6/195/k sz. overpass over the Bara-stream

M6 highway, "M0-Érd top hill" section, M6/195/k sz. overpass over the Bara-stream

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   8,59 m
Width:   left pass: 14,88 m (0,565 m+13,75 m+0,565 m)
right pass: 16,88 m (0,565 m+15,75 m+0,565 m)
Structural height:   0,83 m
   
   

M6 highway, "M0-Érd top hill" section, M6/199 sz. overpass over the pedestrian road

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   reinforced concrete frame bridge
Span(s):   3,40 m
Width:   highway on embankment
Structural height:   48 cm+embankment height
M6 highway, "M0-Érd top hill" section, M6/199 sz. overpass over the pedestrian road
   
   
M6 highway, "M0-Érd top hill" section, M6/200 sz. overpass over the Felső street

M6 highway, "M0-Érd top hill" section, M6/200 sz. overpass over the Felső street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   17,06 m+19,16 m+16,05 m (52,27 m)
Width:   left pass: 14,13 m (1,565 m+12,00 m+0,565 m)
right pass: 17,63 m (0,565 m+15,75 m+1,315 m)
Structural height:   1,28 m
   
   

M6 highway, "M0-Érd top hill" section, M6/208 sz. underpass under the Júlia street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   precast, prestressed girders concrete bridge
Span(s):   24,10 m+24,20 m+19,10 m (67,40 m)
Width:   12,13 m (0,565 m+11,00 m+0,565 m)
Structural height:   1,28 m
M6 highway, "M0-Érd top hill" section, M6/208 sz. underpass under the Júlia street
   
   
M6 highway, "M0-Érd top hill" section, M6/214 sz. overpass over the 6. main road

M6 highway, "M0-Érd top hill" section, M6/214 sz. overpass over the 6. main road

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt.
Structure:   concrete slab bridge with hollow section
Span(s):   14,56 m+18,01 m+14,89 m (47,46 m)
Width:   left pass: 16,515 m (1,565 m+14,385 m+0,565 m)
right pass: 17,015 m (0,565 m+14,885 m+1,565 m)
Structural height:   1,05 m
   
   

M6 highway, "M0-Érd top hill" section, 6/1 sz. planned 6.-7. sz. main road correction overpass above the Bara-stream

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Structure:   precast, prestressed girders concrete bridge
Span(s):   7,00 m
Width:   12,13 m (0,565 m+11,00 m+0,565 m)
Structural height:   0,83 m
M6 highway, "M0-Érd top hill" section, 6/1 sz. planned 6.-7. sz. main road correction overpass above the Bara-stream